
Buenavista Mayor Dave Duallo (inset, upper left corner) gave an update June 14, 2026, on the Tolang Sub-station that will exclusively supply electricity to the towns of Buenavista and Getafe. It is targeted to operate in the month of August and is expected to normalize the power supply in Getafe and Buenavista. The mayor said: “Basin mao na ni ang sulbad sa adlaw2x nga low voltage ug high voltage power supply in Buenavista nga nakahimo ug dakong kadaut, sakripisyo, damyos ug kahasol sa mga tao sa Buenavista.”(Contributed photo)